New Building

Lorystraße 1

Vienna

In Lorystraße 1 / corner Am Kanal 47 in Vienna's 11th district, PREMIUM is building an attractive residential building with 40 apartments ready for occupancy. The property is located in a quiet, very beautiful residential area in Simmering, characterized by numerous well-kept new buildings in the immediate vicinity.

Project volume € 8.500.000
Cumulative living space 2.400 m²
Units 40
Construction 2018 - 2020
Visualization Lorystraße 1
Visualization Lorystraße 1
Lorystraße 1 - Aerial
Lorystraße 1 - Aerial
Lorystraße 1 - Interior
Lorystraße 1 - Interior
Lorystraße 1 - Courtyard
Lorystraße 1 - Courtyard
Lorystraße 1 - Terrace
Lorystraße 1 - Terrace
Lorystraße 1 - Aerial
Lorystraße 1 - Aerial
Lorystraße 1 - Nach Fertigstellung
Lorystraße 1 - Nach Fertigstellung
Lorystraße 1 - Nach Fertigstellung
Lorystraße 1 - Nach Fertigstellung
Lorystraße 1 - Nach Fertigstellung
Lorystraße 1 - Nach Fertigstellung
Architecture Forum Architekten + Ingenieure ZT GmbH

The apartments have one to three rooms and offer sizes between 32 m² and 76 m² and most of them have open spaces such as balconies, terraces or private gardens. They offer intelligent floor plans, well thought-out room layouts and high-quality furnishings. The high-quality residential units can be purchased for private use as well as for precautionary purposes.

The excellent infrastructure within walking distance additionally distinguishes the location. The U3 station "Zippererstraße" and the stop of the same name of the tram line 71 are only a few minutes' walk away. In the immediate vicinity of the property, in the opposite direction, there is the Geiselbergstraße express train station with a connection to the city centre in about 10 minutes and to Vienna Schwechat Airport in about 15 minutes. Within walking distance to the property, on the Simmeringer Hauptstraße, there are numerous local suppliers, pharmacies and shops for daily needs.

  • 15 May
    2020

    Handover - Lorystraße 1

    Despite corona restrictions, the project in Lorystraße was completed in May 2020. At the beginning of June, the apartments were handed over to the owners ready for occupancy. 

    © PREMIUM Immobilien
    © PREMIUM Immobilien
  • 26 Feb
    2020

    Current construction status in February 2020 - Lorystraße 1

    The current status of the construction work from February 2020

    © PREMIUM Immobilien
    © PREMIUM Immobilien
  • 02 Dec
    2019

    Current construction status in December 2019 - Lorystraße 1

    The current construction status in December 2019

    © PREMIUM Immobilien
    © PREMIUM Immobilien
  • 31 Jul
    2019

    Current construction status in July 2019 - Lorystraße 1

    The current construction status in July 2019

    © PREMIUM Immobilien
    © PREMIUM Immobilien
  • 28 Feb
    2019

    Start of construction - Lorystraße 1

    In Lorystraße 1 / corner Am Kanal 47 in Vienna's 11th district, PREMIUM is building an attractive residential building with 40 apartments ready for occupancy. Construction has been started in February of this year and completion is scheduled for spring 2020.

    © PREMIUM Immobilien
    © PREMIUM Immobilien
Your personal contact
Viola Hiermann
+43 1 545 40 70 DW 42
vertrieb@pd.eu